How and from what you can make real asphalt yourself. Technologies and recipes for making high-quality asphalt with your own hands


Do-it-yourself technology for laying and repairing asphalt at the dacha

Garden paths should not only have a beautiful appearance, but also be highly durable so that a cart with building materials, etc. can be moved along them. Today there is a wide range of materials for paving paths, but most of them have a high price. This is why it is often best to pave garden path, because asphalt is one of the cheapest building materials. Read on to learn how to properly pave a driveway!

The advantage of asphalt paths

Speaking about asphalt, I would immediately like to say that this building material has more disadvantages than advantages in relation to a summer cottage.

Asphalting of a summer cottage

Asphalt pavement has only a few main advantages - low cost, high strength, simple technology creation and versatility. Often asphalt is chosen only because it has the lowest price compared to materials for paving garden paths such as paving slabs, paving stones, decking, natural stone, etc.

The disadvantages of asphalt are very significant factors that affect not only landscape design garden plot. Among the most significant disadvantages are:

  1. In hot weather, asphalt evaporates and exposes the human body to harmful substances. Besides this myself bad smell will not allow you to have a rich rest in the garden, which is what we need.
  2. Asphalt coating has practically no decorative ability, so it is not only not suitable for decorating a site, but on the contrary, it will worsen the situation. Asphalt paths practically do not fit into garden styles, which is also very bad. The only exception is colored asphalt, to which various pigments are added, so that the coating can be not only the usual gray, but also green, pink, blue, etc.
  3. If laid poorly, asphalt quickly deteriorates winter period: water gets into the cracks, freezes, and when it freezes, it destroys the coating.
  4. During the heat, the asphalt melts.

As you can see, the disadvantages of asphalt pavement are more significant than the advantages, but despite this, it is recommended to build asphalt paths on the functional nodes of the garden: for example, between the garage and the utility block. It is strictly prohibited to build asphalt paths near recreation areas. due to the harmfulness of asphalt.

How to lay asphalt with your own hands?

In order to lay asphalt at your dacha with your own hands, you need to carefully prepare the area, know the technology of laying asphalt, and have at least a homemade manual roller for asphalt paving.

You should immediately draw your attention to the fact that it is very difficult to make asphalt yourself, because... it is necessary to heat the bitumen, mix it with crushed stone and additives and know the correct proportions. Since asphalt is not expensive, it is best to order a ready-made mixture from a road repair company. IN in this case You won’t lose a lot of money, but the asphalt will be delivered to you hot right to the installation site; all you have to do is quickly level it, compact it and roll it.

So, let's get down to business!

First of all, we mark the boundaries of the future asphalt path. At this point, it is necessary to remove a layer of soil (at least 30 cm, it all depends on the purpose of the path) and make sure that no tree roots pass near the future path, otherwise they will soon begin to destroy the asphalt. If there are roots, cut them out with an ax. After this, we install curbs along the entire perimeter of the path, which will be the boundaries. The role of the curb is not only to prevent the spread of asphalt, but also a decorative function. To install borders, we dig a small, level trench and plant them on cement mortar into this trench. To create an even border, we stretch the rope from the beginning to the end of the sides of the path and guide ourselves along this rope. Bricks can be used as a border, laid not only on the side edges, but also at an angle.

Preparing the area for asphalt paving

Next, we begin to create a cushion under the asphalt. We thoroughly compact the bottom of the trench for the path, fill it with the first layer of crushed stone (10-15 cm thick, coarse fraction) and compact it again. On this layer we pour another layer of crushed stone, but only of a finer fraction, the layer thickness is no more than 10 cm. Well, the last layer is sand, about 5-10 cm. As soon as the pillow is created, fill it with water and, using the roller, carefully Let's roll away.

To prevent water from collecting on the asphalt path, make a small drain in advance: build the path at an inclination of 1-2 degrees and equip it with small drainages that direct the flow of water into the soil.

Laying new asphalt

As we said earlier, it is more advisable to order asphalt from the factory. After the asphalt is delivered to your site, you must immediately proceed to laying it, because the solution hardens quickly.

Laying new asphalt

First of all, we spread the asphalt with a shovel over the entire area of ​​the path, making an even filling. Next, using a motor mop, we level the asphalt along the entire path, adding asphalt into the holes and leveling the bumps. Please note that the minimum thickness of the asphalt pavement must be at least 5 cm to ensure the strength of the garden path. Therefore, this requirement must be observed.

As mentioned earlier, asphalt hardens quickly, so to create a path it is better to invite several assistants to make the process faster.

As soon as part of the path is planned, we take a hand roller and begin to roll this section, while the rest plan the path further.

Mandatory requirement: before rolling the path, lubricate the roller with diesel fuel so that the asphalt does not stick to it and the path is perfectly level. You can also lubricate shovels with diesel fuel to make it easier to throw asphalt onto the path.

When working with the roller, you must move slowly, making only straight-line movements (reverse movements are prohibited). During rolling, seams will form at the joints between the lines; in order to remove them, it is necessary to roll across the seams.

Never leave the roller on the track after work.

For high-quality rolling, the roller must protrude beyond the border of the track by at least 10 cm.

If the weight of the roller is not enough to roll the track well, then you can ask one of the assistants to stand on the frame of the roller, then the weight will increase.

- DIY asphalt laying lesson

You can see the asphalt laying process in more detail here:

Laying asphalt on old pavement

If you decide to lay asphalt not on the soil, but on an old asphalt surface or concrete screeds, then the process of preparing the area will change. Instead of a cushion of crushed stone and sand, you just need to repair the old coating. To do this, you need to rid the surface of dirt and various debris; if there are small cracks, they need to be widened manually so that in the future they are tightly clogged with asphalt.

After this, it is necessary to pour molten bitumen along the entire perimeter of the future garden path and, using a motor mop, spread the bitumen into strips of 50 cm (no less). Along the entire length of the path, it is necessary to make transverse bitumen strips in half-meter increments, and then we create an asphalt path with our own hands using the technology indicated above.

How to repair an asphalt path?

Even if you have laid the asphalt with high quality with your own hands, the path will still sooner or later begin to collapse. The most often destructive factors are:

  • Asphalt began to melt in hot weather
  • Water got into the cracks in winter and when it thawed, it destroyed the coating.
  • Heavy equipment for which this path is not designed has driven onto the asphalt path.

To repair asphalt pavement with your own hands, it is recommended to use cold asphalt, which can be laid even with low temperatures(minus).

How to cover broken asphalt?

If the asphalt path has completely collapsed and is not suitable for repair, then this situation must be corrected. There are two ways to fix a broken asphalt driveway:

  1. Remove asphalt and re-pave
  2. Lay paving slabs on top of the asphalt or pour concrete screed

As for the first method, all construction companies involved in road repairs must remove the broken asphalt, re-create a cushion of crushed stone and sand, and roll out a new asphalt surface. For an inconspicuous garden path, this process will be difficult and not economically profitable.

It would be more expedient to pour a layer of sand (at least 5 cm) on top of the asphalt, fill it with water and start paving paving slabs. We have already talked about how to properly pave a garden path from paving slabs in this article.

Another option is to pour a concrete screed over the asphalt surface. This option is simpler, but at the same time, the concrete path will be far from an ideal addition. garden decor, unlike a path made of paving slabs.

This is all I wanted to tell you about how to properly lay asphalt with your own hands, as well as how to repair or replace it. We hope that our article will help you create an asphalt path with your own hands!

http://samdizajner.ru

Asphalt still remains the most popular type of road surface, despite the constant appearance of modern road materials on the market. It is practical to use, durable, wear-resistant and resistant to environment. A properly asphalted road or even a garden path will serve the site owner faithfully for many years, without requiring repair or restoration work.

How to lay asphalt with your own hands

If you need to lay asphalt, you can use the services of a specialized company, or you can do all the work yourself. You can choose a specialized company at any site providing this type of service. The choice depends on how confident you are in your abilities and experience. An improperly laid coating can quickly collapse, deform and crack. To lay asphalt, for example, in a country house, several steps must be completed.

1. Preparatory work: you need to mark the locations of the paths, taking into account the location of underground communications.
2. Earthworks: the top fertile layer of soil must be removed. For paths, you can remove from 10 to 25 cm; for a road for a car, make the pit deeper. The greater the planned load on the road, the deeper the excavation should be.
3. Preparation of the base: the bottom of the pit must be compacted ( best option- vibrating plate). In order to prevent heaving forces from acting on the road, it is necessary to fill in a gravel cushion - a layer of coarse gravel up to 15 cm thick for the road and up to 10 cm for pedestrian paths. This layer must also be compacted. The second layer consists of pouring fine gravel up to 10 cm thick and river sand on top. All these layers must be shed generously with water. You can replace layer-by-layer preparation with a monolithic concrete slab - this option will be more expensive.
4. Buying asphalt: it is better to buy asphalt at the nearest asphalt concrete plant in a ready-made state. So, even with delivery, it will cost less than if you cook it yourself. On average, 1 ton of asphalt concrete is enough to pave 10 sq.m. 10 cm thick.
5. Laying asphalt concrete: laying should be done on a sunny day on which no precipitation is expected immediately after delivery. The asphalt is thrown with a shovel, and then it is compacted with the same vibrating plate or rammer. Depending on the load on the future asphalt surface, laying is carried out in 1 or several layers. For the entrance to the house, it is enough to lay from 5 to 7 cm, and for paths 3-4 cm is enough.
6. Compacting asphalt concrete is a labor-intensive and necessary operation. The quality of the compaction will determine the longevity of the road. The road or paths can be sealed in different ways hand-held devices- vibrating plate or hand roller. The asphalt must have a temperature of at least 105 degrees. It is very important to guide the roller correctly in one direction.

How to lay paving slabs on asphalt

Asphalt can be used in its original form - as it is. But in this case, it has a small drawback - in the summer heat it overheats and begins to smell specifically or can become deformed when heavy machinery drives onto it. In addition, this is still a traditional coating, which can sometimes get boring. To make the paths more aesthetically pleasing, they can be covered with paving slabs.

Usually, if you want to lay paving slabs on top of the asphalt, up to 5 cm of cement mortar is placed directly on the surface. Approximately 1 part cement to 4 parts sand is the proportion of the mortar. Stacked cement screed is well leveled by a long rule. And paving slabs are already laid on top of it. In just 3-7 days, depending on the weather, such a layer cake of asphalt-cement screed-paving slabs hardens so firmly that you can resume the movement of cars on it or park a car on this site.

If you don't want to suffer

You can't just lay asphalt that easily and quickly yourself. Must have special equipment- the same vibrating plate or hand roller, you need to be able to use them well so that the coating turns out smooth, and not ribbed and with seams. It is necessary to quickly spread the asphalt mixture after its preparation, because otherwise it will cool down, and the cooled asphalt will have to be compacted longer and more thoroughly. In addition, do not forget that in order for a road or sidewalk to last a long time, it is necessary to provide for drainage, water drainage, and curbs. All this must be done simultaneously with installation. A reasonable question may arise: how much does asphalt paving cost? In fact, this is not such a huge figure that it is worth risking the quality of installation and the aesthetics of future entrances to the house.

How much does it cost to lay asphalt?

If you are looking for information on how much it costs to asphalt a road, you must take into account that the cost depends on the volume of work performed. Therefore, it is enough to find out how much asphalting 1 m2 costs. The cost of asphalting can be found out by any link from the search results, for example.

Expert advice

Prev Next

To oil paint to prevent it from drying out during storage and to prevent a film from forming on it, place a circle of thick paper on the surface of the paint and fill it with a thin layer of drying oil.

" Polyethylene film, covering a balcony or greenhouse, is protected from being torn off by the wind by a string stretched on both sides at intervals of 10-15 cm."

"To work with concrete mixture it was easier, clay is usually added to it, but clay reduces the strength of the mixture. Add a spoon to it washing powder based on a bucket of water. "

"To prevent the screw, the head of which is hidden behind the obstacle, from rotating along with the tightened nut, you need to throw several turns of thread or thin wire over it and lightly tighten the ends. Due to friction, the screw is held well in place. The ends of the thread can be cut off after tightening."

"You can cut out a birdhouse entrance without a brace. It is enough to split the front side of the board in the center and cut out half-holes of the required size with a chisel or hatchet, and then connect the halves again."

Wooden screw plugs crumble and fall out of the wall. Take your time to cut out the new plug. Fill the hole in the wall tightly with nylon from an old stocking. Using a nail of a suitable diameter heated red hot, melt a hole for the screw. The fused nylon will turn into a strong cork.

"It is not difficult to turn a carpenter's level into a theodolite by equipping it with an aiming device from a slot and a front sight."

"In order for two strips of linoleum to lie end to end, it is convenient to use a self-adhesive decorative film, placing it under the base of the noleum."

"To ensure that the nail goes in the right direction and does not bend when driven into a deep hole or groove, it should be placed inside the tube, secured with crumpled paper or plasticine."

Before drilling a hole in concrete wall, secure a piece of paper just below. Dust and concrete fragments will not fly around the room.

"To cut a pipe exactly at a right angle, we recommend doing this. Take an even strip of paper and screw it onto the pipe along the sawing line. The plane passing through the edge of the paper will be strictly perpendicular to the axis of the pipe."

"Roll over logs or wooden beams A simple device will help - a piece of motorcycle or bicycle chain, supplemented with a hook on one side and secured to a crowbar on the other side. "

"In order for one person to be able to work with a two-handed saw, we recommend using a simple technique: move the saw handle from the top to the bottom position."

You can cut a piece of slate of the required size with a saw, but it is better and easier to punch holes along the line of the intended cut with a nail at a frequency of 2-3 cm, and then break off the slate on the support.

"The best way to stick tiles to the wall: take bitumen, melt it and drop just four drops on the corners of the tile. It sticks dead in place."

When making shaped window casings, it is most convenient to cut shaped holes with a hacksaw with a sharpened blade.

"Making stained glass is a long and difficult task. You can make a quick imitation of stained glass. To do this, take thin slats or rods of vines, glue them to a sheet of glass, and then paint the glass and cover it with varnish."

"If you don't have a dowel at hand, you can make one from a piece of plastic tube. The body of a ballpoint pen can also be suitable for this. Having sawed off a piece of the required length, make a longitudinal cut, about halfway, and the dowel is ready."

"It is known how difficult it is to hang a door when working alone. But just shorten the bottom pin by 2-3 mm and the work will become much easier."

"A very durable, non-shrinking and fairly waterproof putty is made from bustylate mixed with any powder - chalk, gypsum, cement!, sawdust, etc."

"If you need to screw a screw into the end of a particle board, drill a hole slightly smaller than the diameter of the screw, fill the hole with Moment glue (not epoxy!), screw the screw in a day later. The board does not delaminate. However, the resulting connection can only be placed under load through day. "

"It is more convenient to secure portraits, photographs, paintings in wooden frames with glass not with nails, but with the help of pushpins bent at right angles. The pins are gently pressed with a screwdriver. Compared with nails, the danger of splitting thin frames is reduced to a minimum."

"It is not so easy to screw a screw into hard wood. If you poke a hole for the screw with an awl, and rub the screw itself generously with soap, then after such an operation the work will go like clockwork."

To save time, the edge of the wallpaper can be trimmed with a sharp knife without unrolling the roll. To do this, you must first align the end of the roll and with a simple pencil outline the edge border on the outside. Working with a knife, the roll must be gradually turned in the direction of rolling.

To carry large sheets of plywood, glass or thin iron at home, it is convenient to use a wire holder with three hooks at the bottom and a handle at the top.

IF you need to saw a round stick into the distance, this work is most conveniently done using a template. It is made of a metal tube with a groove in the middle. The diameter is chosen so that the template slides freely along the stick.

It will be better and easier to work with a hacksaw if in the middle part you increase the height of the teeth by 1/3.

If you attach a weight weighing about a kilogram to the front of the bow saw machine, the work will become easier. The load must be made removable so that the saw can be used to perform other work.

"A wax-like coating can be obtained by painting the surface with diluted PVA glue. To obtain desired color, you need to dilute the glue with water tinted with watercolors. "

"Making a cover for an ax blade is as easy as shelling pears. Take a piece of rubber tube, cut it lengthwise and put it on the blade. It is protected from slipping off by a ring cut from an old car camera."

" Avoid using clamps when gluing wooden frames A laundry cord will help. You should put four short loops on the corners of the frame and two long ones to tighten the frames diagonally. The angles are adjusted using sticks that twist the middle loops. "

"How to silence a creaking floorboard? Between the floorboards you need to drill a hole at an angle of 45° with a diameter of 6-8 mm, drive a wooden pin into it, lubricated with wood glue, cut off the protruding end with a chisel and putty on the floor surface."

"To make it easier to sand a floor covered with varnish or paint, iron it with an iron through a damp cloth - and the work will become easier."

"Slight rotting on wood can be eliminated as follows: the affected wood is removed from the healthy layer, and then soaked in a 10% formaldehyde solution. After drying, the area is puttied and painted over."

Garden paths are an important attribute of landscape design. It is worth considering that they should not only be beautiful, but also functional. And in this article I would like to consider paths that do not need to attract attention. Asphalt pavement is ideal for such garden paths.

Disadvantages of asphalt pavement

Firstly, the chemical composition of asphalt causes the asphalt surface to sometimes smell unpleasant in the summer.

Secondly, asphalt is susceptible to cracks and deformation. But more often this happens due to poor-quality installation or incorrectly selected weather conditions: It is best to lay asphalt in warm weather and on a carefully prepared surface.

What can be attractive about an asphalt garden path?
Asphalt is quite cheap! And, most importantly, it is easy to clean. Asphalt pavement is ideal for “inconspicuous” and extremely functional paths leading to a garage or shed. It can also be considered as an option for covering a broken concrete walkway.

From others positive points It is worth noting that asphalt can be colored (there is red and green asphalt), which can be wonderful decorative solution. And if you roll pebbles into the asphalt surface when laying it, then it may well look like a design element of the garden.

So, what do we need to lay asphalt?

Materials and tools:

  • sand
  • gravel
  • curb blocks or bricks
  • bitumen
  • crushed stone
  • hard brush
  • stroke
  • garden roller

Instructions for laying an asphalt garden path

1. First, let's prepare the ground. If this is not done, the asphalt may crack over time, and the surface of the garden path will not be smooth and durable. A solid foundation is obtained by mixing sand and gravel. The resulting composition should be laid out in a thick layer of 6 cm on solid ground. If the foundation is old path First of all, you need to seal all the holes.
2. For good drainage, do not forget about a slight slope.
3. The most vulnerable places of the asphalt pavement are the edges, which often begin to crumble. To avoid this, we strengthen the borders with curb blocks or bricks. Wooden blocks are also suitable for this purpose.
4. Let's move on to the most crucial moment - styling. Cover the surface with bitumen. First, mix it, then pour it out of the container and apply it to the entire surface using a stiff brush.
5. Pour crushed stone on top (size 0.5-2 cm) and begin to press the crushed stone into the bitumen. The layer thickness is 2 cm. The surface must be compacted properly to avoid air pockets.
6. We make several approaches with a garden roller.
7. We fill the visible voids and go over the surface with a roller several more times.
8. We fence the edges of the path with a curb. Bricks placed on edge are ideal for this purpose: in addition to serving as a functional border that prevents the edges of the path from crumbling, their placement will help make the path part of the design concept of the entire site.

Any owner country house or dacha strives to improve his site as much as possible. For this purpose, paths are laid, various landscape planning methods are used, and plants are planted. One of the most popular ways to improve appearance any site is paving at the dacha, the price of which from our company is the most favorable in Moscow and the region as a whole.

What do we offer?

    Short deadlines for completing work. Our company has its own fleet of all the necessary special equipment, which makes it possible not to involve third parties for rent. Our equipment is always in working condition, so we are ready to start work at any convenient time - immediately after concluding an agreement with the customer.

    The most affordable price. High-quality asphalting of paths in a dacha (the price per m2 always depends on many factors), carried out by our specialists, will allow you to significantly save on bringing a site of any size into the most suitable condition for use. Price square meter The coating laid by the company is the most affordable in the region, thanks to the use of asphalt concrete mixtures purchased directly from manufacturers. The absence of resellers, our own fleet of equipment and qualified personnel made it possible to significantly reduce the costs of our regular and potential customers.

    Guaranteed quality. Asphalting at the dacha (the price in Moscow is the most affordable) has a guaranteed service life of 3 years - this will allow our clients not to worry about its quality: at any time we will correct any problem with the pavement.

Prices for paving a summer cottage plot per m2

Prices for other works:

Job titleThickness, cmUnit ChangePrice RUR
Sampling of an earthen trough with subsequent removal and leveling of the territory to the mark- m3890
Sand base installation10 m2115
Construction of crushed stone base10 m2185
Device concrete base with road mesh reinforcement10 m2595
Construction of a foundation made of asphalt chips10 m2140
Installation of road side stone 100x30x15- p.m.785
Installation of lawn edge stone 100x20x8- p.m.545
Dismantling of curb stones with loading and removalp.m.m2170
Pouring the base with bitumen emulsion- m214
Cutting seams with a diamond blade- m2120
Manual soil sampling followed by removal- m31140
Parsing noun asphalt pavement with loading and removal4-5 m2375
Leveling the soil in the road trough to the design level- m275
Milling of asphalt pavement with loading and removal4-5 m2195
Loading and removal of construction waste- m3485
Construction of pavement slabs- m21450
Dismantling of road slabs- m2445

Preface

It’s possible to make asphalt with your own hands, but to do this you need to know a few things important details, which will save your time and protect you from injury. You will find details about making this mixture, as well as advice from professional builders, later in the article!

Hot asphalt and step-by-step instructions for its production

Main terms of this material is crushed stone, ordinary river sand, bitumen resin, and polymer materials for laying on the surface. The last component is not always used, as it is expensive; it is used mainly in the construction of highways and highways. Despite the fact that all the components can be found in the shed, make road surface It will be a little difficult at the dacha. You should seriously prepare for this process

We need a container for mixing the “ingredients”, a fire (can be a fire) for 6-8 hours continuously, about 100 liters of water to cool the suspension, as well as one of the pastes to keep everything together. Its role can be played by resin or bitumen (preferred). Let's look at the manufacturing instructions step by step.

Step 1 Prepare the container.

The first step is to make a prototype of a concrete mixer, since it would be irrational to “kill” an expensive and useful item. Suitable for our purposes metal barrel from under oil or diesel fuel, in which they sell a branded product. If you don’t have one, you can buy it for pennies (or borrow it for free) from any farmer or from the company itself that bottles oil into retail containers. They are often thrown into scrap metal as industrial waste. Close the lid and drill holes in the bottom center with an electric drill. We thread a metal rod (pipe, corner, square, etc.) and scald inverter welding so that there are no leaks anywhere. We weld an L-shaped twig to one of the edges, creating a “skewer”.

Step 2 Mix the ingredients.

We pour crushed stone into our “concrete mixer”, add a little sand (2:1) and mix everything thoroughly. You can't pick up wet ones. building materials- they will immediately stick together, and it will be very difficult to pick them out from the metal walls.

Step 3 Heat the bitumen and polymer additives.

In a separate container (it is best to take a 15-liter bucket), we need to heat the bitumen to a boil; for better elasticity, you can add shampoo to it. It will burn out later, but it will be much more convenient to stir. We also add polymers and plasticizers there.

Step 4 Mix everything together.

You don’t need a lot of imagination here, just take and add boiling bitumen to a preheated barrel with crushed stone and sand. Important: do not mix if the barrel and all components are not warmed up - the bitumen will quickly cool down and mixing will be impossible. For convenience, you can first add 50 liters of water to a barrel and bring to a boil. After this, pour in bitumen and stir until the water evaporates.

The boiling point of water is 100 degrees, exactly what we need for bitumen to make it fluid and sticky. Remember not to overheat this material - it ignites at a temperature of 170 degrees, so watch the water. Just finished - pour it out!

Step 5 Pour into the holes.

The area in which you will pour asphalt must be thoroughly cleaned, preferably blown out with a compressor. After you pour in the hot mixture, you need to take a roller or any other tool (tamper) and compact the material. Be sure to wet the metal of the tool with water so that it does not stick to the bitumen during compaction.

If you follow the instructions, making asphalt at home will be safe, fast and even very interesting!

What is cold asphalt and what is its feature?

Quite recently, a rather interesting product came to the territory of Russia - polymer asphalt. Its peculiarity is that it can be laid at absolutely any temperature. Tests have shown excellent viscosity and adhesiveness even at -20C, which makes it possible to repair roads or make an entrance to a dacha even in winter.

It consists of fluid bitumen grade SG or MG 70/130, characterized by increased viscosity. It also contains special plasticizers and modifiers that act similarly to “ cold welding" Due to this, it is possible to obtain even at negative temperatures excellent result. The tracks will have increased strength and will last much longer than regular asphalt. The technology has been implemented for more than 5 years in Russia, and now anyone can buy such material.

There is no point in looking for a method on how to make asphalt with your own hands, since cold technology involves a high-tech injection molding process and is not available at home. Its cost is much higher than conventional road surfaces, so it is rarely used in industry. But every summer resident can buy required quantity for making paths in the garden or a small driveway for a car. You can buy it in a regular store. Installation does not require special knowledge: just pour the mixture into the right place and compact it with any in a convenient way, even car tires.

How to make new asphalt from old road surface

Another very popular method of improving a site without much capital investment is to use old road surfaces as the main raw material for making a new one. To do this, we need about 100 kg of old coating, which is thrown away during highway repairs, fresh bitumen, 10 kg of resin for elasticity and a concrete hardener. Let's look at what needs to be done step by step.

Step 1We make a concrete mixer using electric drill.

We make a concrete mixer using an electric drill, an oil barrel and a twig as described in the first section of the article.

Step 2 Grind the components.

Use a hammer to break up all the large pieces remaining from the old road. Check that the fraction of all components is fine, up to 40 mm. Add a little sand there and mix everything. We begin to heat the barrel with old asphalt and sand placed in it, fill in 60-70 liters of water, bring to a boil and “cook the soup.”

Step 3 Prepare the solution for adding.

Now is the time to take care of the liquid part. Since the old road surface already contains some bitumen, we will need 50% less of it. That is, we take about 10 kg of bitumen and 10 kg of resin per 100 kg of material, heat it to a boil. Then we pour it all into a heated barrel with other components, mix thoroughly with a metal rod.

Homemade asphalt from free components is ready. Now all that remains is to pour it into pre-cleaned holes or onto a site prepared for laying. Such material will serve you for many years and will be no worse than “branded” material.

  • Print

grounde.ru

Do-it-yourself technology for laying and repairing asphalt at the dacha

Speaking about asphalt, I would immediately like to say that this building material has more disadvantages than advantages in relation to a summer cottage.

Asphalting of a summer cottage

Asphalt pavement has only a few main advantages - low cost, high strength, simple creation technology and versatility. Often asphalt is chosen only because it has the lowest price compared to materials for paving garden paths such as paving slabs, paving stones, decking, natural stone, etc.

The disadvantages of asphalt are very significant factors that affect not only the landscape design of the garden plot. Among the most significant disadvantages are:

  1. In hot weather, asphalt evaporates and exposes the human body to harmful substances. In addition, the unpleasant smell itself will not allow you to have a rich rest in the garden, which is what we need.
  2. Asphalt coating has practically no decorative ability, so it is not only not suitable for decorating a site, but on the contrary, it will worsen the situation. Asphalt paths practically do not fit into garden styles, which is also very bad. The only exception is colored asphalt, to which various pigments are added, so that the coating can be not only the usual gray color, but also green, pink, blue, etc.
  3. If laid poorly, asphalt quickly deteriorates in winter: water gets into the cracks, freezes, and when it freezes, it destroys the coating.
  4. During the heat, the asphalt melts.

As you can see, the disadvantages of asphalt pavement are more significant than the advantages, but despite this, it is recommended to build asphalt paths on the functional nodes of the garden: for example, between the garage and the utility block. It is strictly forbidden to build asphalt paths near recreation areas, due to the harmfulness of asphalt.

How to lay asphalt with your own hands?

In order to lay asphalt at your dacha with your own hands, you need to carefully prepare the area, know the technology of laying asphalt, and have at least a homemade manual roller for asphalt paving.

You should immediately draw your attention to the fact that it is very difficult to make asphalt yourself, because... it is necessary to heat the bitumen, mix it with crushed stone and additives and know the correct proportions. Since asphalt is not expensive, it is best to order a ready-made mixture from a road repair company. In this case, you will not lose a lot of money, but the asphalt will be delivered to you directly to the installation site hot, all that remains is to quickly level it, compact it and roll it.

So, let's get down to business!

First of all, we mark the boundaries of the future asphalt path. At this point, it is necessary to remove a layer of soil (at least 30 cm, it all depends on the purpose of the path) and make sure that no tree roots pass near the future path, otherwise they will soon begin to destroy the asphalt. If there are roots, cut them out with an ax. After this, we install curbs along the entire perimeter of the path, which will be the boundaries. The role of the curb is not only to prevent the spread of asphalt, but also a decorative function. To install curbs, we dig a small, level trench and plant them in cement mortar in this trench. To create an even border, we stretch the rope from the beginning to the end of the sides of the path and guide ourselves along this rope. Bricks can be used as a border, laid not only on the side edges, but also at an angle.


Preparing the area for asphalt paving

Next, we begin to create a cushion under the asphalt. We thoroughly compact the bottom of the trench for the path, fill it with the first layer of crushed stone (10-15 cm thick, coarse fraction) and compact it again. On this layer we pour another layer of crushed stone, but only of a finer fraction, the layer thickness is no more than 10 cm. Well, the last layer is sand, about 5-10 cm. As soon as the pillow is created, fill it with water and, using the roller, carefully Let's roll away.

To prevent water from collecting on the asphalt path, make a small drain in advance: build the path at an inclination of 1-2 degrees and equip it with small drainages that direct the flow of water into the soil.

Laying new asphalt

As we said earlier, it is more advisable to order asphalt from the factory. After the asphalt is delivered to your site, you must immediately proceed to laying it, because the solution hardens quickly.

Laying new asphalt

First of all, we spread the asphalt with a shovel over the entire area of ​​the path, making an even filling. Next, using a motor mop, we level the asphalt along the entire path, adding asphalt into the holes and leveling the bumps. Please note that the minimum thickness of the asphalt pavement must be at least 5 cm to ensure the strength of the garden path, so this requirement must be observed.

As mentioned earlier, asphalt hardens quickly, so to create a path it is better to invite several assistants to make the process faster.

As soon as part of the path is planned, we take a hand roller and begin to roll this section, while the rest plan the path further.

Mandatory requirement: before rolling the path, lubricate the roller with diesel fuel so that the asphalt does not stick to it and the path is perfectly level. You can also lubricate shovels with diesel fuel to make it easier to throw asphalt onto the path.

When working with the roller, you must move slowly, making only straight-line movements (reverse movements are prohibited). During rolling, seams will form at the joints between the lines; in order to remove them, it is necessary to roll across the seams.

Never leave the roller on the track after work.

For high-quality rolling, the roller must protrude beyond the border of the track by at least 10 cm.

If the weight of the roller is not enough to roll the track well, then you can ask one of the assistants to stand on the frame of the roller, then the weight will increase.

DIY video tutorial on laying asphalt

You can see the asphalt laying process in more detail in this video:

Laying asphalt on old pavement

If you decide to lay asphalt not on the soil, but on an old asphalt surface or concrete screeds, then the process of preparing the area will change. Instead of a cushion of crushed stone and sand, you just need to repair the old coating. To do this, you need to rid the surface of dirt and various debris; if there are small cracks, they need to be widened manually so that in the future they are tightly clogged with asphalt.

After this, it is necessary to pour molten bitumen along the entire perimeter of the future garden path and, using a motor mop, spread the bitumen into strips of 50 cm (no less). Along the entire length of the path, it is necessary to make transverse bitumen strips in half-meter increments, and then we create an asphalt path with our own hands using the technology indicated above.

How to repair an asphalt path?

Even if you have laid the asphalt with high quality with your own hands, the path will still sooner or later begin to collapse. The most often destructive factors are:

  • Asphalt began to melt in hot weather
  • Water got into the cracks in winter and when it thawed, it destroyed the coating.
  • Heavy equipment for which this path is not designed has driven onto the asphalt path.

To repair asphalt pavement with your own hands, it is recommended to use cold asphalt, which can be laid even at low temperatures (minus).

How to cover broken asphalt?

If the asphalt path has completely collapsed and is not suitable for repair, then this situation must be corrected. There are two ways to fix a broken asphalt driveway:

  1. Remove asphalt and re-pave
  2. Lay paving slabs on top of the asphalt or pour a concrete screed

As for the first method, all construction companies involved in road repairs must remove the broken asphalt, re-create a cushion of crushed stone and sand, and roll out a new asphalt surface. For an inconspicuous garden path, this process will be difficult and not economically profitable.

It would be more expedient to pour a layer of sand (at least 5 cm) on top of the asphalt, fill it with water and begin paving the paving slabs. We have already talked about how to properly pave a garden path from paving slabs in this article.

Another option is to pour a concrete screed over the asphalt surface. This option is simpler, but at the same time, a concrete path will not be an ideal addition to garden decor, unlike a path made of paving slabs.

This is all I wanted to tell you about how to properly lay asphalt with your own hands, as well as how to repair or replace it. We hope that our article will help you create an asphalt path with your own hands!

samdizajner.ru

DIY asphalt path at the dacha

Surely, you have often encountered a very unpleasant situation on summer cottage after heavy rain: it is very difficult to walk through the area drowning in loads and there is little joy. Therefore, you may have brilliant idea about laying an asphalt path instead of the usual trodden dirt road.

At first glance, the idea may seem absurd, since in most cases we see asphalt on roads or cities. On the other hand, there is nothing so outlandish about asphalt - it is convenient, practical, and given the possibility of laying colored asphalt, it is also beautiful.

There are two main ways to pave the main places of movement in the country:

  • You can attract specialists with special equipment. Road workers will arrive on a crawler bulldozer, level everything and lay asphalt in a matter of hours (if you have a plot of several hectares, then this method nothing at all);
  • the second option is for those who like to do everything with their own hands and using improvised means.

In favor of asphalt, compared to gravel, concrete paths and a cobblestone path, a number of arguments can be made.

  • Maintainability - patching an asphalt hole is as easy as shelling pears, unlike a concrete one.
  • Accuracy. The gravel path will eventually “teleport” to nearby areas and will need to be collected, while the asphalt will remain where you left it forever.
  • Simplicity. Laying an asphalt path requires less physical effort and the involvement of specialists.
  • Design. Colored asphalts laid in a cold state are excellent design solution and yard decoration.

  • Shovel, rake, asphalt, water, tamping roller, decorative stone, level, hand roller.
  • Guide trench. Decide on the direction of laying, use a shovel to make a recess with the required height. A 30 cm layer of asphalt is not needed on a summer cottage, but it is not worth making a path less than 3 cm. The edges of the recess can act as sides, but you can reinforce them with guides or decorative stones, which will remain there and serve as a decorative border.
  • Warp. All foreign and large objects and stones should be removed from the prepared recess, the surface should be carefully leveled with a rake and rolled with a compacting roller. If the soil is very dry and cannot be compacted, moisten it with a little water.
  • Laying. You might have seen this stage in urban conditions during the laying of asphalt: you transport asphalt with a wheelbarrow or other special equipment, pour it into the prepared trench and level it over the entire area. At the end, it is necessary to create a slight slope to allow water to flow to the sides. To do this, use a rake to “comb” the asphalt a little from the edges to the center.
  • Tamping. The simplest but most important stage. For it you will need a manual roller, with which you need to roll the asphalt from start to finish 5-6 times (you can do 10 - it won’t hurt). You need to roll not in a zigzag, but separately on each side: first the left, then the right, and at the end you roll the center, thereby ensuring a slope.

If you decide to implement such an interesting idea, then first try asphalt small area behind the house - master this craft at least a little, and then go to the central “highway”.

moscowsad.ru

How to lay asphalt correctly?

Asphalt concrete, or asphalt, is a multicomponent mixture of bitumen, sand, gravel or crushed stone. To improve it technical characteristics or in order to reduce cost, it may contain additional fillers such as cement, crumb rubber, mineral and polymer additives.

The reliability of an asphalt pavement depends on the use of high-quality components in the mixture, their uniform mixing, and maintaining temperature regime during production and storage. In addition, the planned location for laying the asphalt pavement should be as close as possible to the place of its production, so that the time for transporting the material is as minimal as possible.

Advantages and disadvantages of the material

The main advantages of laying asphalt are:

  • affordable cost, especially in the case of small-scale applications;
  • possibilities instant cooking in factory conditions;
  • durability of the coating, subject to compliance with the manufacturing and installation technology;
  • the relative simplicity of laying asphalt in the presence of special equipment.

The disadvantages of asphalt and concrete are:

  • a sharp decrease in technical characteristics when heated under the influence of sun rays;
  • evaporation of bitumen when heated and the release of harmful fumes;
  • the need to maintain the required temperature until the asphalt pavement is laid.

At the same time, despite the presence of serious shortcomings, a price alternative to asphalt concrete has not yet been found. A path made from paving slabs will be noticeably more expensive.

Work to improve the quality and versatility of the material is being carried out as part of the selection of more effective mixtures. Good results are achieved by adding polymer mixtures and reducing the volume fraction of bitumen.

Purpose of the constituent components


Asphalt concrete with and without mineral powder.

The first asphalt was made from natural bitumen. Then they began to use bitumen, obtained as a result of oil distillation, when heating liquid hydrocarbons. Today it is the most common binder for the production of asphalt concrete mixtures.

Sand, gravel or crushed stone in asphalt play the role of the main working fillers. Sand is necessary to more evenly distribute pressure within the asphalt layer and fill voids between individual stones. Together with bitumen, it binds larger fractions of stone, holds them and does not allow them to go up beyond the layer.

Fractions of gravel and crushed stone determine the group of asphalt concrete and its area of ​​application. All asphalt pavements are conventionally divided into three groups according to density, depending on the size of the stones used:

  1. dense, with a gravel fraction of 5-10 mm, for paving courtyards, sidewalks, paths and other surfaces with low load;
  2. porous, with a stone size of 10-20 mm, for laying lower layers in multilayer coatings;
  3. highly porous, with a crushed stone fraction of 20-40 mm, for use on critical sections of highways.

This porosity distribution determines the ability of asphalt to transmit moisture and drain it into the drainage layer for further drainage into the ground. Therefore, highly porous material is more difficult to install, but its service life is much longer.

Finely ground chalk, limestone or sandstone are added as mineral fillers. They fill the last remaining voids and make the asphalt path more uniform. Moreover, the best mineral filler is made from sandstone, as a chemically neutral substance.

By adding crumbled rubber, crushed to sizes of 1.0-1.5 mm, ductility and hydraulic stability increase. Therefore, asphalt with it is often used to cover the roof of workshops industrial enterprises. Asphalt concrete with crumb rubber less likely to crack and has springy properties.